TampaGov home page
             My TampaGov    en Español
For Immediate Release

For more information contact:
Brad L Baird, P.E., Director of Water Department
(813) 274-8663
 
Traffic on West Kennedy Boulevard between Rome and Packwood Avenues Temporarily Affected by Water Main Repairs
 
Tampa, FL October 2, 2013 - The inside westbound lane and eastbound left turn lane on west Kennedy Boulevard are temporarily closed between Rome and Packwood avenues while the Tampa Water Department repairs a distribution system valve. Barricades and signs are located in the area to assist with traffic flow. Drivers should seek alternate routes during this period. Please use caution when traveling in the area.

Repairs are expected to be completed today. Routine traffic patterns are expected to resume late Thursday, October 3, weather conditions permitting.

The staff and crews of the Tampa Water Department appreciate everyone’s patience during this time.



The above notice is archived content and may contain information that is no longer valid. This includes URL's that were valid when originally published, but may now link to sites or pages that no longer exist.


Related Links
back
view all current notices
printer-friendly version