TampaGov home page
             My TampaGov    en Español

The 2009 permit fee schedules listed below pertain to all construction projects within the Tampa city limits

NOTE:  Fees for permits or services not specified above will be calculated by the Construction Services Division Manager, or his/her designee, utilizing the most current MAXIMUS NEXUS methodology based on the estimated actual cost to perform the work.