Electrical


Underground: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.

Rough-In:  To be made after the roof, framing, fire-blocking and bracing is in place and prior to the installation of insulation and wall or ceiling membranes.

Final: To be made after the building is complete, all required utilities and electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.

Mechanical


Underground: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place.

Rough-In: To be made after the roof, framing, fire-blocking and bracing is in place and all ducting and other concealed components are complete, and prior to the installation of insulation and wall or ceiling membranes.

Final: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy.

Plumbing / Gas


Underground: To be made after trenches or ditches are excavated, piping installed and tested, and before any backfill is put in place.

Rough-In and Tub Set: To be made after the roof, framing, fire-blocking and bracing is in place and all gas, water, soil, waste and vent piping is complete and tested, and prior to the installation of insulation and wall or ceiling membranes.

Final: To be made after the building is complete, all required utilities and plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.

Gas Rough piping: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected.

Gas Final piping: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test.

Gas Final: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to insure compliance with all the requirements of this code and to assure that the installation and construction of the gas system is in accordance with reviewed plans.