COMMERCIAL PHASED FINISH BUILDING INSPECTIONS
 

Commercial Permits - Phased Finish: Building Inspections

Framing

To be made after the roof, all framing, fire blocking and bracing is in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete and shall at a minimum include: Window/door framing installation, Vertical cells/columns, Lintel/tie beams, Framing/trusses/bracing/connectors, Draft stopping/fire-blocking, Curtain wall framing, Energy insulation, Accessibility.

Sheathing / Cladding

To be made either as part of a dry-in inspection or done separately at the request of the contractor after all roof and wall sheathing and fasteners are complete and shall at a minimum include: Roof & Wall sheathing, Sheathing fasteners, Roof/wall/dry-in, and Windows/door bucks.

Roof

Shall at a minimum include: Dry-in, Insulation, Roof coverings, and Flashings.

Fire Resistance Rated/Penetration

To be made after the installation of fire resistant drywall, joint/penetration protection, and fireproofing materials, and prior to installation of finishes.

Building Final

To be made after the shell is completed and all required Phased: Finish permits are final.

For further information, please refer to Inspection Requirements and Codes.