COMMERCIAL PHASED FINISH ELECTRICAL, MECHANICAL, PLUMBING / GAS INSPECTIONS
Commercial Permits - Phased Finish: Mechanical, Electrical, Plumbing / Gas Inspections

Electrical


Slab Underground: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.

Rough-In: To be made after the roof, framing, fire-blocking and bracing is in place and prior to the installation of insulation and wall or ceiling membranes.

Mechanical


Underground Inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place.

Rough-In: To be made after the roof, framing, fire-blocking and bracing is in place and all ducting and other concealed components are complete, and prior to the installation of insulation and wall or ceiling membranes.

Plumbing / Gas


Underground: To be made after trenches or ditches are excavated, piping installed and tested, and before any backfill is put in place.

Rough-In and Tub Set: To be made after the roof, framing, fire-blocking and bracing is in place and all gas, water, soil, waste and vent piping is complete and tested, and prior to the installation of insulation and wall or ceiling membranes.

Gas Rough-In: Shall be performed after the roof, framing, fire-blocking and bracing is in place and all gas piping is complete, and prior to the installation of wall or ceiling membranes.

Final inspection on the above will be done, once plans are approved for either Phase: Finish or Interior Finish and permits have been issued for same.

For further information, please refer to Inspection Requirements and Codes.