|
Quick Links |
Roof Dry-In
Roof Sheathing, Nailing, Blocking, and Ply ClipsInspector will verify sheathing size and type, according to approved plans. Inspect crickets where applicable and verify sheathing is nailed according to design. Inspector will also verify fire rated sheeting, nail size, installation of ply clips and check unsupported edge blocking. FinalOnce the in progress inspections are performed, then inspector will perform the final roof inspection, which will include:
For further information, please refer to Inspection Requirements and Codes.
|

