|
Quick Links |
Site General Conditions
Initial Site InspectionTo be made prior to beginning construction when tree protection and silt barriers are in place, all root and limb pruning is completed and all permitted trees are removed or relocated. For further information, refer to the Standard Preparation Requirements. Erosion Sediment ControlTo be made prior to any scheduled or unscheduled inspection. Verify all silt barriers and other erosion control measures are in place and properly maintained such that sediment laden runoff is controlled. For further information, refer to Erosion and Sediment Control. Site Clearing BrushSite Clearing and site clearing underbrush inspections begin after Initial Site Inspections have been passed. The inspector will monitor the site ensuring all approved brush, trees, trash, and foliage have been removed and hauled away. For further information, please refer to Inspection Requirements and Codes.
|

