|
Quick Links |
Explore
Highlights
from the collection
|
![]() ![]() ![]() ![]() |
The following excerpts are taken from the TAMPA Public Art PROGRAM GUIDELINES, prepared by McGregor Consulting with Donna Graves in June, 2000. To speed viewing, topics are linked separately.
Highlights from Excerpts:
Project Identification [Public Art Action Plan, Priorities, Ways for Community Groups and Artists to Initiate Projects]
Art Selection [Acquisition Methods, Methods of Artist Selection, Panel Composition, Modified Panel Composition, Artist Recruitment and Outreach, Budget, Panel Meetings, Follow Up, Artist Eligibility]
Post Selection and Project Management [Pre-Contract, Contracting with Artists, Artists Fees, Agents, Contracting Provisions, Design Development, Fabrication, Design Team Projects, Post Installation and Final Acceptance Procedures, Public Information, Signage, Education]
Public Participation [Education and Outreach, Community Participation, Creative Interaction Between Artists and Community, Diversity]
Portable Works Collection [Purpose, Selection Criteria, Selection Process, Installation Considerations, Care and Maintenance, Deaccessioning Guidelines, Loans]
Collection Management [Goals, Artist Responsibilities, City Responsibilities, Procedures for Maintenance and Conservation, Alteration, Removal, Relocation or Deaccession, Objectives, Procedures]
Downtown Development/CBD [Purpose, Calculation, Location, Eligible Projects, Ineligible Projects, Eligible Costs, Recommended Process, Staff Meeting/ Pre-Application Conference,
Policies as to Gifts, Loans and Memorials
Appendices: Appendix A [Art Selection Plan]
Appendix B [Artist Fee and Fee Scales]
Appendix C [Catalog and Maintenance Record]
![]() |
The Appendices are in "PDF" format. If you do not have the Adobe Acrobat Reader installed, please go to the Acrobat Reader download page first! |
Please provide content that will be displayed in the right column. This column will be constrained by a specified width.

