...route to the City of Tampa home page
Contract Administration

Quick Links


Construction Project Bidding

Bids will be received no later than 1:30 p.m. on the indicated Date(s) for the Project(s) listed below.

Bids will open in the 4th Floor Conference Room, Tampa Municipal Office Building, 306 E. Jackson Street, Tampa, Florida 33602.

Pre-Bid Conferences are held at the same location unless otherwise indicated.

Plans and Specifications for this work may be examined at the Contract Administration Department, 306 E. Jackson Street, 4th Floor North, Tampa, Florida 33602. Copies may be obtained upon payment of the refundable deposit indicated for each set. Deposits are refunded if documents are returned in good condition within 15 days after bid opening. Deposits should be in the form of separate checks for each project. Mailing is available for an additional charge of $10.00 per set. Delivery via certain other parcel services may be available by providing an account number. Checks should be made payable to the City of Tampa. Subcontracting opportunities may exist for the City certified Women/Minority Business Enterprises (W/MBE's) listed in the current W/MBE directory. Visit City of Tampa's Minority Business Development office for more information.

Phone (813) 274-8456 for assistance.  Fax Technical Questions to (813) 274-8080.

 
Contract
Deposit
 Estimate
Bid Opening Date Title Scope Pre-Bid

Downloadable

Addenda Files
08-C-00007 06/03/08 Bruce B. Downs Wastewater Relief Force Main Construction of 3,250 LF of 24-inch HDPE Pipe and pavement restoration. 05/20/08   Bid Notice
Specifications
Plans
Soil borings
08-C-00022 05/20/08 Howard F. Curren AWTP Main Pump Station Wet Well Rehabilitation Rehabilitation of 8,300 SF of corroded concrete wet well walls. 04/29/08 ADD 1
ADD 2
ADD 3
Bid Notice
Specifications
Plans
Planholders
08-C-00040 05/20/08 Interbay Repump Station Improvements Improvements to the existing Interbay Repump Station to maintain adequate pressure in the distribution system and accommodate future growth within the service area. 04/29/08 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Specifications
Plans
Planholders
6-C-13 05/20/08 Ybor City Streetscape Improvements-22nd St to 26th St Sidewalk improvements with associated landscaping, lighting and all associated work. 04/29/08 ADD 1
 
Bid Notice
Specifications
Plans
Planholders
Letter of Clarification
08-C-00018 05/06/08 Howard F. Curren AWTP Drying Beds Rehabilitation, Phase 1 Furnish labor and materials, and equipment to extend 12-inch sludge drying bed drain pipes and install manholes in order to clean and TV-inspect the drain pipes. 04/22/08 ADD 1 Bid Notice
Planholders
Specifications
Plans
Inspection Video
Bid Tab
6-C-79 04/29/08 Centennial Park General site work for the central portion of the park including plaza, stage, brick retaining wall, concrete, brick banding, electrical, pavement restoration. 04/15/08   Bid Notice
Planholders
Specifications
Plans
Bid Tab
08-C-00019 04/29/08 Howard F Curren AWTP Final Sedimentation Tanks Rehabilitation, Phase 1 Removal of existing cross collector flights, shafts and wear strips in six sedimentation tanks. 04/15/09 ADD 1 Bid Notice
Specifications
Plans
Planholders
Bid Tab
08-C-00032 04/08/08 Columbus Drive Municipal Office Building HVAC Replacement and Upgrades Replacement of existing rooftop HVAC equipment. 03/18/08 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Specifications
Plans
Bid Tab
08-C-00016 04/01/08 Howard F. Curren AWTP Sludge Storage Tanks Rehabilitation The project provides for furnishing all labor, materials, and equipment to remove existing mixing equipment and tank baffles. 03/18/08 ADD 1 Bid Notice
Planholders
Bid Tab
7-C-26 04/01/08 Fire Station No. 1 Roof Improvements Removal of existing roof membrane and installation of built-up roof membrane. 03/18/08 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Bid Tab
7-C-94 04/29/08 Ballast Point Park Pier Improvements Rehabilitation of the existing fishing pier encasement of degraded concrete bent caps and piles. 02/19/08 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Planholders
Bid Tab
08-C-00026 03/18/08 Manhole Rehabilitation by Structural Coating System Rehabilitate 41 Manholes in the Bayshore, Bush, and Platt Interceptors by installation of a structural coating system. 02/26/08 ADD 1 Bid Notice
Planholders
Bid Tab
08-C-00023 03/11/08 Annual Wastewater Force Main Replacement Construction of 6,150 linear feet of 4-inch through 12-inch diameter PVC, HDPE and/or DIP force main sewer pipe.   ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
6-C-53 02/26/08 Robles Park Roof Replacement Renovation of portions of the entry roofs at the Robles Park Building. 2/12/088   Bid Notice
Planholders
Bid Tab
08-C-00008 03/04/08 Lake Kipling Urban Lakes Rescue Construction of three pre-cast concrete sediment traps including removal of excess sediment from Lake Kipling. 02/12/08 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Bid Tab
08-C-00025 01/22/08 Waverly Place Stormwater Pipe Relocation Construction of concrete stormwater system.   ADD 1 Bid Notice
Planholders
Bid Tab
Award
08-C-00009 01/22/08 Temple Heights Road Stormwater Improvements Construction of stormwater pipe system to reduce flooding in neighborhood.     Bid Notice
Planholders
Bid Tab
08-C-00004 01/22/08 Kinnan Pumping Station Rehabilitation Removal and installation of control equipment, emergency generators, station piping, pumps, valves, access cover doors, chain link fence, water service. 01/08/08 ADD 1
ADD 2
 
Bid Notice
Planholders
Bid Tab
08-C-00003 01/22/08 Manhole Rehabilitation of Clark Phase 2 and Various Interceptors Rehabilitate 80 manholes in various locations throughout the City of Tampa. 12/18/07 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Bid Tab
Award
07-C-00081 01/08/08 HFC AWTP Heat Drying Facility Rehabilitation Rehabilitate the building roof and gutter system, replace interior structural members, and apply corrosion control coating system on interior steel components.
Bid Has Been Cancelled
11/13/07 ADD 1
ADD 2
Bid Notice
Planholders
08-C-00002 01/08/08 Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P.) Small Diameter FY08 The rehabilitation of gravity sewers from 8-inch diameter to 12-inch diameter at various locations throughout the City of Tampa.   ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-75 12/18/07 Tampa Reclaimed Water System Performance Improvements Construct test and maintain reclaimed water flushing services and new system appurtenances for the reclaimed water system, and conducting a unidirectional flushing of the transmission main, distribution piping and service lines. 12/04/07 ADD 1 Bid Notice
Planholders
Bid Tab
7-C-10 11/27/07 Cypress Point Park Shoreline Stabilization Removing of sand berms and bars, providing groins system, beach sand, plantings, complying with permit requirements. 11/06/07 ADD 2 Bid Notice
Planholders
Bid Tab
Award
08-C-00001 11/20/07 Wastewater Gravity Sewer Construction FY08 Construction of 2600 linear feet of 6  and 8 inch diameter PVCP, including asphalt pavement restoration, concrete driveway and sidewalk restoration, sodding.   ADD 1
ADD 2
Bid Notice
Planholders
BidTab
Award
7-C-43
$20.00
$970,000
10/9/07 Sewer Rehabilitation by Cured-in-Place Pipe FY07 The rehabilitation of gravity sewers from 8-inch diameter to 36-inch diameter at various locations throughout the City.   ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-79
$20.00
$500,000
9/11/07 Howard F, Curren AWTP Chlorination System Upgrade Phase 2 Installation of a complete chlorine and sulfur dioxide system. 8/21/07 ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-69
$20.00
$575,000
8/28/07 River Garden Park Shoreline Restoration Restoration of approximately 2000 linear feet of Hillsborough River shoreline within the River Garden Park. 7/24/07 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Planholders
Bid Tab
Award
7-C-63
$20.00
$160,000
8/28/07 TPD Aviation Unit Fuel Tank Replacement Replaces an underground fuel storage tank with an above ground fuel storage tank for the TPD Aviation Unit. 8/14/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-61
$20.00
$435,000
8/28/07 New Tampa Nature Park Improvements Work shall include 1/2 mile entrance road, asphalt parking lot of 24 spaces, stormwater control elements, concrete walks, 1/2 mile asphalt trail. 7/31/07 ADD 1
ADD 2
ADD 3
LOC 1
Bid Notice
Planholders
Bid Tab
7-C-76
$20.00
$530,000
8/21/07 Howard F. Curren AWTP Digester No. 6 Rehabilitation, Phase 1 Transport and dispose of waste materials stored in the drying beds at the Howard F. Curren Advanced Wastewater Treatment Plant. 8/07/07 LOC 1 Bid Notice
Planholders
Bid Tab
Award
7-C-31
$20.00
$190,000
8/21/07 Twiggs Street Garage Improvements Concrete restoration work up to full depth for slabs, beams and columns on the top levels of the garage including the installation of supplemental drains.  8/07/07   Bid Notice
Planholders
Bid Tab
Award
6-C-54
$20.00
$300,000
8/21/07 Cypress Point Park Restroom Building Installation of pre-fabricated building, including foundation, testing and inspections. 7/24/07 ADD 1 Bid Notice
Planholders
Bid Tab
7-C-20
$20.00
$210,000
8/14/07 San Carlos Pumping Station Flow Meter Replacement and Emergency Bypass Connection Installation of 2 flow meters at the San Carlos Pumping station with all associated piping modifications. 7/24/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-15
$20.00
300,000
8/07/07 Cancer Survivor Park Drainage Ditch Improvements Installing precast reinforced piping into an existing open ditch and filling the slope to provide overhead cover. 7/24/07 ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-84
$20.00
$400,000
7/31/07 Lake Roberta-Urban Lake Rescue Project The project provides construction of approximately 250 If  2 grate inlets, 1 endwall. 7/17/07 ADD 1
LOC 1
Bid Notice
Planholders
Bid Tab
Award
6-C-77
$20.00
$200,000
7/17/07 Fire Training Burn Prop. The project provides for the design and engineering manufacturing, transporting, permitting and installation of modular containers to provide a fire training burn building that complies with, or provides for future compliance with, Florida Statue 69A-37, including tie-downs, utility connections. N/A ADD 1 Bid Notice
PlanHolders
Bid Tab
Award
7-C-54
$20.00
$400,000
7/17/07 46th Street and Riverhills Drive Stormwater Sediment Trap The project provides for furnishing all labor, materials and equipment for construction of approximately 177 l.f. of 18" diameter, 155 l.f. of 24" diameter, and 16 l.f. of 19" x 30" elliptical stormwater pipe, 1 doghouse manhole, 6 inlets, 1 headwall including riprap, clean fill, and one precast concrete stormwater sediment trap structure and diversion box including roadway base, stabilization, force main offsets, water line adjustments, asphalt paving, concrete sidewalks and driveways, sodding, root pruning. N/A ADD 1 Bid Notice
Plan Holders
Bid Tab
Award
7-C-33
$20.00
$500,000
7/17/07 Annual Wastewater Force Main Replacement Construction of miscellaneous wastewater force mains at various locations throughout the City. N/A ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-52
$20.00
$345,000
7/10/07 Howard F. Curren AWTP Nitrification Pumps AFD Replacement Removal of 5 existing frequency drives and 2 speed motor controllers the replacement of 7 new AFD's and all associated work required. 6/26/07   Bid Notice
Planholders
Bid Tab
Award
7-C-82
$20.00
$208,000
06/26/07 West Columbus Drive and Riverside Drive Stormwater Sediment Trap Project provides for furnishing all labor and construction of one stormwater sediment trap. N/A ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-55
$20.00
$300,000
06/26/07 Curb and Gutter Construction-Citywide Construction of concrete curb and gutter at various locations throughout the City. N/A ADD 1
Bid Notice
Planholders
Bid Tab
Award
7-C-51
$20.00
$850,000
06/26/07 Sierra Circle Stormwater Pipe Relocation, Phase 1 Construction of concrete pipe storm sewer, including inlets, manholes, concrete curbing and driveways. 06/12/07 ADD 1
ADD 2
LOC 1
LOC 2
Bid Notice
Planholders
Bid Tab
Award
7-C-34
$20.00
$690,000
06/12/07 City-Wide Traffic Calming Devices FY07 Project provides for construction and installation of various traffic calming devices including the installation of speed tables, signage, pavement markings, sidewalks, curbing, landscaping and asphalt pavement 05/29/07   Bid Notice
Planholders
Bid Tab
Award
7-C-53
$20.00
$19,000,000
05/22/07 Water Main Construction Project provides for furnishing and installing water mains and appurtenances for water mains ranging in size from 2” to 42” in diameter. 05/08/07 ADD 1
Bid Notice
Planholders
Bid Tab
Award
7-C-7
$20.00
$220,000
05/22/07 Sidewalk Construction FY07 Bayshore Blvd and East Tampa Construction of sidewalks and installation of pedestrian ramps at various locations. 03/20/07 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Planholders
Bid Tab
Award
7-C-17
$20.00
$575,000
05/17/07 Carmen Pumping Station Rehabilitation and Force Main Replacement Rehabilitation of Carmen Pumping Station located at 3606 W. Carmen Street and the replacement of the station's discharge force main.  The force main replacement consists of installing approximately 1,735 of 8" PVC/HDPE pipe. N/A ADD 1 Bid Notice
Planholders
Bid Tab
Award
6-C-12
$20.00
$1,145,000
04/24/07 Cyrus Green Pool Improvements Demolition of south wall of existing pool, construction of new pool decks, renovation of existing equipment building 03/27/07 ADD 1 ADD 2
ADD 3
ADD 4
Bid Notice
Planholders
Bid Tab
Award
6-C-71
$20.00
$177,000
04/10/07 Picnic Island Park Restroom Improvements (SBE Project) Renovation of 468 S.F launch area restrooms; renovation of 622 S.F beach area restrooms and construction of 165 S.F addition to the beach area restrooms. Small Business Enterprise set aside project. Only City certified SBE firms are eligible to bid. 03/27/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-9
$20.00
$700,000
04/10/07 Woodland Terrace Community Center Addition Construction of a new 3,000 s.f. addition to the existing structure.    03/27/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-41
$20.00
$1,100,000
04/10/07 Wellswood Ballfield Lighting Improvements Replacement of all existing field lighting, poles, fixtures and all related accessories and associated electrical power equipment and wiring for 6 ball fields. 03/13/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
6-C-56
$20.00
$185,000
01/16/07 Jefferson and Whiting Streets Signal Installation Construction of Traffic Signal Installation Safety Project at the intersection of Jefferson and Whiting Streets including directional bore.   ADD 1 Planholders
Bid Notice
Bid Tab
Award
6-C-57
$50.00
1,650,000
01/09/07 Tampa Riverwalk Segment 8 (FKA 2A) under Platt Street Bridge The proposed work comprises construction of a pile-supported concrete pedestrian bridge, precast concrete slabs, rubble rip-rap, including benches, lighting and trash receptacles. 10/17/06 ADD 1
ADD 2
ADD 3
ADD 4
Planholders
Bid Notice
Bid Tab
Award
7-C-8
$20.00
$320,000
11/7/06 North Nebraska Ave Wastewater System Rehabilitation by Cured-in-Place Pipe Kennedy Blvd to Hillsborough Ave Rehabilitation of approximately 4,485 lf of 8-inch diameter, 1,665 lf of 10-inch diameter and 360 lf of 12-inch diameter sanitary sewers by a Cured-in-Place process.   ADD 1 Planholders
Bid Notice
Bid Tab
Award
7-C-2
$20.00
$500,000
10/31/06 Citywide Stormwater Rehabilitation by Cured-in-Place Pipe The proposed work comprises furnishing labor, materials, and equipment to rehabilitate, by installation of a cured-in-place liner, gravity stormwater pipes.   ADD 1 Planholders
Bid Notice
Bid Tab
Award
7-C-5
$20.00
$220,000
10/24/06 Sidewalk Construction New CDBG FY07 The project provides for construction of sidewalks and installation of pedestrian ramps at various locations throughout the City. 10/10/06 ADD 1 Planholders
Bid Notice
Bid Tab
Award
7-C-4
$20.00
$700,000
10/24/06 Annual Wastewater Gravity Sewer Construction FY07 The project consist of furnishing all labor, materials and equipment for the construction of approximately 3,600.   ADD 1
ADD 2
Planholders
Bid Notice
Bid Tab
Award
6-C-39
$20.00
$200,000
10/10/06 Swann Pumping Station Electrical Upgrade Upgrade the electrical service from a 240 VAC system to a 480 VAC including installation of a new motor control center, pump motors and controls. 8/22/06 ADD 1
ADD 2
ADD 3
Planholders
Bid Notice
Bid Tab
Award
6-C-78
$20.00
$240,000
10/10/06 Hanna and Trout Pumping Stations Standby Power Facility Re-bid The work includes installation and commissioning of standby power facilities at the Hanna and Trout Pumping Stations including installation of a new generator, fuel tank, and automatic transfer switch and controls at each pumping station. N/A ADD 1
ADD 2
ADD 3
Planholders
Bid Notice
Bid Tab
Award
6-C-5
$20.00
$1,000,000
09/26/06 Parking Access and Revenue Control System at Ft. Brooke, Whiting Street and Twiggs Street Garage Construction of a fully integrated, on-line real time parking access and revenue control system. 07/25/06 ADD 1
ADD 2
ADD 3
ADD 4
Planholders
Bid Notice
Bid Tab
6-C-4
$20.00
$577,500
09/26/06 Parking Access and Revenue Control System at William F. Poe Garage Construction of a fully integrated, on-line real time parking access and revenue control system. 07/25/06 ADD 1
ADD 2
ADD 3
ADD 4
Planholders
Bid Notice
Bid Tab
6-C-74
$20.00
$500,000
09/19/06 Howard F. Curren AWTP Digester #5 Rehabilitation Removal and replacement of existing valves and piping; and repainting existing pipe and equipment. 9/5/06 ADD 1
ADD 2
Planholders
Bid Notice
Bid Tab
Award
7-C-1
$20.00
$460,000
09/19/06 Sidewalk Reconstruction, City-Wide FY07 Reconstruction of sidewalks and the installation of pedestrian ramps at various locations. 09/5/06 ADD 1
ADD 2
Planholders
Bid Notice
Bid Tab
Award
6-C-69
$20.00
$2,300,000
08/29/06 New Tampa Recreation Center Construction of a 20,000 vs.. facility which includes site work, concrete, masonry, steel, metal building system, metal and built up roofing, cement plaster, painting, finishes, mechanical, electrical, plumbing. 06/27/06
2:00 pm
ADD 1
ADD 2
ADD 3
ADD 4
Planholders
Bid Notice
Bid Tab
Award
6-C-40
$20.00
$300,000
08/8/06 Idlewild Pumping Station Rehabilitation Bypassing of wastewater flows, removal of the existing pumping station concrete slab, control panels and pedestal. Installation of new station pumps, piping, valves, controls and water services and all appurtenant work. 07/18/06 ADD 1 Planholders
Bid Notice
Bid Tab
Award
6-C-25
$20.00
$3,500,000

08/08/06 Louisiana Pumping Station Replacement Construction of a new pumping station complete with submersible pumps, valves and piping, tap existing force mains for connection to new station. 07/25/06 ADD 1
ADD 2
Planholders
Bid Notice
Bid Tab
6-C-23
$20.00
$525,000
08/08/06 Manhole Rehabilitation of Adamo, Clark and Sligh Interceptors Rehabilitation of 52 manholes by installation of a structural coating system liner. N/A ADD 1
ADD 2
Planholders
Bid Notice
Bid Tab
Award
6-C-3
$20.00
1,856,000
08/8/06 Water Service Line Replacement Installation and abandonment of metered water service lines, and all associated work required for a complete project in accordance with the contract document. 7/18/06   Planholders
Bid Notice
Bid Tab
Award
6-C-72
$20.00
$350,000

08/01/06 West Tampa Stormwater Sediment Trap (Habana Ave) Construction of one stormwater sediment trap, including roadway restoration, driveway restoration, re-setting granite curb, sodding, videotaping and all appurtenant work. N/A ADD 1
ADD 2
Planholders
Bid Notice
Bid Tab
Award
6-C-36
$20.00
$125,000
08/01/06 La Mancha Dos Pumping Station Replacement Removal of existing pumps, valves, piping, control panel, SCADA system, and appurtenances N/A ADD 1 Planholders
Bid Notice
Bid Tab

 

The downloadable files available on this page are in PDF format. If you do not have Adobe Reader you may download them for free from Adobe Acrobat.



Copyright © 1996-2008 City of Tampa.  All rights reserved. - Last Updated: 5/15/2008