New Construction Plan Examination Fees
Building Projects:
Fire Marshal plan examination fees for commercial occupancy
construction projects are calculated with the following table
based on the square footage of area under construction or the
construction activity to be performed. Fees are due upon
application and submittal of construction plans. These are new
fees.
Project Plan Examination Fee/Area Under Roof 2nd Resubmittal
- Up to 5,000 $10.00/$5.00
- 5,001 - 10,000 $30.00/$7.00
- 10,001 - 15,000 $50.00/$12.00
- 15,001 - 20,000 $70.00/$17.00
- 20,001 - 25,000 $90.00/$22.00
- 25,001 - 30,000 $110.00/$27.00
- 30,001 - 35,000 $130.00/$32.00
- 35,001 - 40,000 $150.00/$37.00
- 40,001 - 45,000 $170.00/$42.00
- 45,001 - 50,000 $190.00/$47.00
Buildings with multiple stories shall be calculated at a per
floor rate from the table above. For Floors in excess of 50,000
square feet, add the amounts listed above to $190.00.
New Construction Plan Examination
Fees
Fire Protection and Fuel Systems:
All plan review submittals for fire
suppression, fire alarm, and fire detection systems, shall be
assessed a review fee of $25.00 per floor per system.
All plan review submittals for site plans, fuel storage and fuel
dispensing systems shall be assessed a
review fee of $25.00.
New Construction
Permits/Inspections:
Reinspections fees are for the area requiring a reinspection. All
reinspections are subject to a reinspection fee.
Permit/Inspection Type Proposed
Permit/Inspection Fee/
Reinspection Fee
- Fire Marshal Final Inspection (for each floor). $40.00/$50.00
- Fire Suppression/Detection/Alarm System Permits:
- Underground Fire Mains. $40.00/$50.00
- Fire Sprinkler Systems (for each floor). $40.00/$50.00
- Standpipe Systems (for each standpipe). $40.00/$50.00
- Fire Pumps (for each fire pump w/ jockey). $40.00/$50.00
- Hood Extinguishing Systems (per system). $40.00/$50.00
- Other Extinguishing Systems (per system). $40.00/$50.00
- Fire Alarm/Smoke Detector Systems (per floor). $40.00/$50.00
- Fire Alarm Monitoring/Supervision Device. $40.00/$50.00
- Flammable and Combustible Storage Tanks:
- Tank Abandonment/Removal. $40.00/$50.00
- Above Ground Installation (per tank). $40.00/$50.00
- Underground Installation (per site). $40.00/$50.00
- New Dispensers, Piping Alteration (per site). $40.00/$50.00
- Liquified Petroleum Gas:
- Per Tank Installation. $30.00/$25.00
- Piping Rough-In. $25.00/$15.00
- Site Inspections: