...route to the City of Tampa home page
Parks and Recreation

Quick Links


Tampa Trails & Greenways Project Minutes of Advisory Committee Meeting


Call to Order 6:00PM

Date: MAY 11, 2003

Seminole Heights Garden Center, 5800 Central Avenue, Tampa, Florida

Attending: Dawn Gibson, FDOT7; Randy Stribling, South Seminole Heights; Nina Mabilleau, COT Transportation Division; Larry Weatherby, Hillsborough Greenways; Sharon Keene, Riverside Heights; Sally Flynn, Ballast Point; Michael Moule, Livable Streets, Inc.; Jill Buford, SOS Communities; Kevin Dwyer, CAPT; Karla Price, COT P&R; Mary Helen Duke, COT P&R.

Meeting commenced at 6:00 pm.

Randy Stribling acted as Chair of the meeting in the absence of Sally Thompson at the request of Ms. Thompson.

Mr. Stribling opened the floor for public comments. There were none.

Mary Helen Duke reported that the six CMAQ applications had been approved by administration and submitted to the MPO for prioritization consideration. The CAC recommended priorities were as follows: 1. Hillsborough River Greenway – Downtown Phase; 2. Hillsborough River Greenway - Lowry Phase; 3. South Tampa Greenway; 4. Hillsborough River Greenway – Pedestrian Bridge Connector; 5. West Tampa Greenway – Lemon Street/Cypress Point Park Connector; 6. (TIE) Bayshore Boulevard Greenway – S. Davis Boulevard.

Mr. Stribling called for approval of the minutes of the April 27, 2004 meeting. Motion made to approve by Nina Mabilleau and seconded by Sally Flynn. Motion passed unanimously.

Ms. Duke updated the CAC on current projects:

South Tampa Greenway City is in the process of finalizing purchase order for trail construction for Gadsden Park. TECO agreement for South Tampa Trail going to City Council. Manhattan Avenue leg has gaming status from FDOT; Dwan Gibson (FDOT 7) explained different status of FDOT projects (candidate vs. gaming vs. adopted). Gibson clarified that the Manhattan leg extends from Tyson Street to Staughton Street.

The Transportation Division is adding bike lanes to Manhattan Ave. from Euclid Ave. to Gandy Blvd. There is a gap between this project and FDOT project on Manhattan. The CAC needs to discuss connection.

Picnic Island Bayou – Duke reported that an adhoc committee with County on canoe/ kayak trails is forming. Ken Kramer to chair. Anyone interested in participating should contact Duke.

McKay Bay Greenway Duke reported the 20th Street FDOT Trail has signage up and some sections open. FDOT7 will also do small section on Adamo Drive between 20th and 22nd Streets. Duke reported that COT staff is meeting next week with Expressway Authority on use of McKay Bay and possible mitigation. Service road may be used as trail. City developing a wish list. There will be public meetings. Duke will report back to the CAC when meetings are known.

West Tampa Greenway Karla Price reported that FDOT is building a trail along the east right-of-way of Dale Mabry Highway between Dr. Martin L. King Blvd. and Hillsborough Ave.

Bayshore Blvd. Greenway Duke reported that a survey of existing conditions along S. Davis Blvd. is complete. The City needs an easement from Aviation Authority and fence relocation.

Hillsborough River Greenway Karla Price reported she is working with South Seminole Heights neighborhood to develop 8’ path within Rivercrest Park.

Duke reported on the Riverside Residences Project and displayed the proposed site plan. The project is located at the base of Brorien St. in downtown east side of river. The developer is building part of the riverwalk as part of project. 15’ wide with pink granite standards. City has requested they relocate the statue and provide a 15 foot uninterrupted public access way on the riverwalk. Condo costs start at approximately $600,000. The developer will be spending over $200,000 on public art.

Duke reported the Transportation Division has a grant to look at installing speed tables on MacDill Ave. near MacDill AFB. We will look at utilizing these as greenway pedestrian crossings.

Duke reported that she will be making a presentation to City Council on status of Greenways on May 13th at 5:30 pm and a presentation to THAN on Wednesday, May 12th at 7:00 pm.

Duke reported that the National Bicycle Greenway Mayor’s Ride would include a proclamation by Mayor Iorio on June 1st at 11:30 am in Cotanchobee/Fort Brooke Park. A ride will take place from base of the Platt St. Bridge to park. Free T-Shirt give away to the first 40 riders.

Duke updated the group on progress of Bayshore Traffic Task Force and preliminary recommendations. Jill Buford would like for Transportation to find out classification of Bayshore Blvd. south of Gandy. Sally Flynn thinks Task Force needs to look at Bayshore Blvd. south of Gandy Blvd. and include it in its recommendations.

Michael Moule of Livable Streets, Inc. provided a power point presentation on greenway pedestrian crossings and design standards.

Mr. Stribling called for consideration of the Bike to Work/Bike Month proclamation. Jill Buford made a motion to approve the Bike to Work proclamation, Sally Flynn second the motion. Motion passed unanimously.

Duke reported that Sally Thompson requested a change in date for July meeting to 20th. There was consensus to change the meeting date. Duke will check on location availability. There being no further business to come before the CAC, the meeting adjourned.

 


Copyright © 1996-2009 City of Tampa.  All rights reserved. - Last Updated: 6/1/2009