...route to the City of Tampa home page
The Tampa
Riverwalk

Quick Links


Tampa Riverwalk Project Status

 14. Kennedy Boulevard Bridge
  Riverwalk image  
Project Report as of October, 2007
Length 150'
Status Will be built as part of the three over water segments called Kennedy Boulevard Plaza.  Design to 30% started in August, 2007.  State funding will be used to complete design to 100% around Fall  of 2008.
Priority High

Copyright © 1996-2008 City of Tampa.  All rights reserved. - Last Updated: 12/21/2007