Construction Site Planning

Construction site planning should take into consideration sediment control and erosion control measures. Pre-construction meetings should include a discussion of plans for sediment and erosion control measures.

Suggested considerations include:

  1. A well-planned construction entrance can prevent major erosion and sedimentation problems.

  2. Construction roads, parking areas, and the construction entrance should be stabilized immediately.

  3. Equipment operators should use designated routes to limit ruts, erosion, and the tracking of sediment and debris from the site.

  4. The permanent stormwater drainage system should be installed during the early stages of construction and used to manage runoff. All inlets should be protected with appropriate measures to prevent sediment from entering the system.

  5. A few small well-maintained traps or barriers properly located will control sediment better than a single large sediment basin.