...route to the City of Tampa home page
Stormwater

Quick Links


Flood Relief - Interbay Ave 6203

Project ID: 08-08
Fiscal Year: 2008
Project Address: 6203 Interbay Ave, 33611


Estimated Project Cost
$110,000

Description
The existing drainage system at this location is overloaded. Construction of approximately 150 linear feet of storm pipe will connect to the existing system to alleviate existing conditions.

Back to Project List

Copyright © 1996-2009 City of Tampa.  All rights reserved. - Last Updated: 6/4/2009