Flood Relief - Coachman/Alline/Asbury Ave

Project ID: 11-09
Fiscal Year: 2011
Project Address: 2921 W Alline Ave, 33611


Estimated Project Cost
$5,000,000

Description
This low-lying basin is subject to flooding during high tides. A back-flow prevention device was installed to reduce saltwater flooding but this has increased the propensity for freshwater flooding during extreme rainfall events. This project will consist of the installation of a pumping system to assist the gravity system in removing floodwaters from the basin.

Back to Project List