TampaGov home page
             My TampaGov    en Español

Capital Improvement Projects

Flood Relief - Alline Avenue Area Drainage Improvements

Project ID: ST-11-003
Fiscal Year: 2011
Project Address: Alline Avenue Area Drainage Improvements, 33611


Estimated Project Cost
~$5,00,000

Description
This neighborhood frequently floods due to tidal influences. This project provides for the construction of a stormwater pumping station, force main, and upgraded collection system and water quality elements. The existing system will be disconnected from the box culvert thereby preventing salt water from backing up in the neighborhood. The pumping station will include a backup generator as well as a telemetry system.

Back to Project List