TampaGov home page
             My TampaGov    en Español

Capital Improvement Projects

Flood Relief - Telemetry System

Project ID: ST-12-088
Fiscal Year: 2012
Project Address: Telemetry System - Citywide, 33602


Estimated Project Cost
~$400,000

Description
To maximize flood protection, an electronic system will be developed to control stormwater pumping stations, ponds and stormwater outfalls. The master station will allow stormwater staff to observe and control operations at each remote location, including control of pumping equipment. Primary communication will be via broadband systems.

Back to Project List