TampaGov home page
             My TampaGov    en Español

Capital Improvement Projects

Flood Relief - Donut Pond: 113th Ave Force Main and Culverts

Project ID: ST-12-095
Fiscal Year: 2012
Project Address: Donut Pond: 113th Ave Force Main and Culverts, 33612


Estimated Project Cost
~$2,500,000

Description
This project is needed because the area in and around this location has a history of structural, yard and street flooding. The scope of this project is to construct a pump station, 42" force main from the new pump station at Donut Pond along 113th Avenue to 30th Street, and upsized culvert crossings at Pine Court and the railroad tracks.

Back to Project List