TampaGov home page
             My TampaGov    en Español

Capital Improvement Projects

Failing Pipe - Interbay Ave: 1st to 3rd Street

Project ID: ST-12-097
Fiscal Year: 2012
Project Address: Interbay Avenue between S 1st and S 3rd St, 33611


Estimated Project Cost
$120,000

Description
The existing ditches were regraded and new stormwater pipes were installed to provide improved stormwater conveyance to the existing box culvert at 3rd Street. This was completed by in-house crews.

Back to Project List