...route to the City of Tampa home page
Stormwater

Quick Links


This screen displays the (CIP) Capital Improvement Projects for the Stormwater Department. You can use the filter dropdown to view Projects by Fiscal Year (FY) or Project Type. Each project contains a link to its corresponding 'Detail' page with additional information. A City of Tampa Fiscal Year is a 12-month period from October 1 until September 30.
Projects
7914 Lakeshore Dr (FY 2011)
2906 E Sligh Ave (FY 2011)
7502 S Mascotte St (FY 2011)
10414 N Connechusett Rd (FY 2011)
5850 Mabel St (FY 2011)
318 E Hydrangia St (FY 2011)
2905 W Comanche Ave (FY 2011)
2921 W Alline Ave (FY 2011)
7607 Lakeshore Dr (FY 2011)
Key   FY 2007   FY 2008   FY 2009   FY 2010
  FY 2011

Copyright © 1996-2009 City of Tampa.  All rights reserved. - Last Updated: 6/4/2009