Quick Links
 |
- Generate bid documents (plans/specifications) for construction by contractors.
- Generate plans and specifications for construction by in-house forces.
- Gather electrical energy consumption data, on a monthly basis, for all
Wastewater
facilities and perform various statistical analyses to discover any billing or operational
irregularities.
- Make electrical energy budget projections using the historical data and TECO's planned
rate adjustments.
- Perform a monthly analysis of the cogeneration facility located at the AWT Plant to
quantify energy production and cost savings.
- Assist the AWT Plant and collection system personnel in the solution of electrical
problems on a "as needed" basis.
- Provide project coordination between the City, TECO, and GTE.
- Review developer electrical designs for pumping stations or other facilities that the
City may appropriate.
- Interface with and assist consulting engineers doing work for the City.
- Review and approve/reject working drawings and component cut sheets submitted by the
Contractor for construction.
- Interface with the City's Electrical Plans Examiner, Inspector, and Fire Marshal as
necessary for design approval.
- Assist the Department's Inspectors as necessary during project construction phase.
- Review as-built information prior to drafting for records.
- Attend pre-bid, pre-construction, and progress meetings as necessary during the
execution of the Contract.
 |