Construction Project Bidding

Projects are officially posted on DemandStar.

The downloadable files available on this page are in PDF format. If you do not have Adobe Reader you may download it  for free from Adobe web site.

Below are links to courtesy files only:

  • September 22, 2017

    Contract:  17-C-00029; Robles Park Pump Station Replacement

    Opening:   1:30 PM, Tuesday, October 24, 2017

    Pre-Bid:     2:00 PM, Tuesday, October 10, 2017 

    Addenda:    ADD1

    Download:  Bid NoticeSpecificationsBid Tab,  Itemized Bid TabAward

  • September 8, 2017

    Contract: 17-C-00043; Himes Avenue from SR60/Kennedy Boulevard to Columbus Drive Traffic Safety Improvements - FDOT LAP

    Opening:   1:30 PM, Tuesday, October 17, 2017
    Pre-Bid:     2:00 PM, Tuesday, September 26, 2017 
    Addenda:   ADD1, ADD2, ADD3,      
    Download:  Bid NoticeSpecifications, Plans, Bid Tab, Itemized Bid Tab, Award,

  • August 18, 2017

    Contract:  17-C-00011; Howard F. Curren AWTP Final Sedimentation Tanks Air Piping Improvements – Sheltered Market 

    Opening:   1:30 PM, Tuesday, September 26, 2017

    Pre-Bid:    10:15 A.M., Tuesday, September 05, 2017

    Addenda: ADD1 PreBidLocationChangeADD2ADD3

    Download:  Bid NoticeSpecifications BidTab Award

  • August 4, 2017

    Contract: 17-C-00037 Fire Station 23 Improvements

    Opening:  1:30 PM, Tuesday, August 29, 2017

    Pre-Bid:   2:00 PM, Tuesday, August 15, 2017

    Addenda:   ADD1

    Download:  Bid NoticeSpecificationsUpdated Bid TabAward

       

  • July 14, 2017

    Contract.: 17-C-00034; Howard F. Curren AWTP Large Motor Softstart Modifications - Rebid

    Opening:  1:30 PM, Tuesday, August 15, 2017 

    Pre-Bid:   10:00 AM, Tuesday, August 01, 2017

    Addenda:   

    Download: Bid Notice, Specifications, Bid Tab, Award

  • July 3, 2017

    Contract:  17-C-00032; Roadway Restoration – Water Department - Cancelled

    Opening:   1:30 PM, Tuesday, August 15, 2017
    Pre-Bid:      2:00 PM, Tuesday, July 18, 2017 
    Addenda:   ADD1, ADD2, ADD3, ADD4,    
    Download:  Bid NoticeSpecifications, Bid Tab, Itemized Bid Tab,

  • July 3, 2017

    Contract:  17-C-00030; David L. Tippin Water Treatment Facility Lime Slaker Replacement

    Opening:   1:30 PM, Tuesday, August 15, 2017

    Pre-Bid:      10:00 AM, Tuesday, July 18, 2017 

    Addenda:   ADD1,  ADD2,  ADD3, ADD4, ADD5, ADD6, ADD7

    Download:  Bid NoticeSpecifications, Bid TabAward

  • June 30, 2017

    Contract:  17-C-00021; Citywide Water Meter and Valve Installation

    Opening:   1:30 PM, Tuesday, August 15, 2017
    Pre-Bid:      2:00 PM, Tuesday, July 18, 2017 
    Addenda:   ADD1, ADD2, ADD3, ADD4, ADD5,    
    Download:  Bid Notice, Specifications, Bid Tab, Itemized Bid Tab

  • June 27, 2017

    Contract: 17-C-00042; Hillsborough River Dam MFL Low Flow Control Gate

    Opening:   1:30 PM, Tuesday, August 8, 2017

    Pre-Bid:    2:30 PM, Tuesday, July 11, 2017 

    Addenda:   ADD1, ADD2, ADD3, ADD4

    Download:  Bid NoticeSpecifications, BidTab, Award

  • June 16, 2017

    Contract: 17-C-00010; Bayshore Boulevard Enhancement, Phase III (from Gandy Blvd. to S. Howard Ave.)

    Opening:   1:30 PM, Tuesday, August 01, 2017
    Pre-Bid:     2:00 PM, Tuesday, July 11, 2017 
    Addenda:  ADD1ADD2, ADD3
    Download:  Bid NoticeSpecifications, Plans, Bid Tab, Itemized Bid Tab, Award,

Subscribe to