Ground Breaking for Utilities Project

Infrastructure Summary Data

Transportation

Bicycle
Facilities

Bike

145 miles

Bridges
(Fixed)

Bridges (Fixed)

39

Bridges (Pedestrian)

Bridges (Pedestrian)

3

Bridges (Movable)

Bridges (Movable)

3

Bridges (Tunnels)

Bridges (Tunnels)

1

Bridges (Operated)

Bridges (Operated)

5

Painted Intersections

Painted Intersections

5

Roadways (Asphalt)

Roadways (Asphalt)

1,160 miles

Roadways (Asphalt, Brick)

Roadways (Asph. Brick)

6 miles

Roadways (Brick)

Roadways Brick

41 miles

Roadways (Concrete)

Roadways Concrete

2 miles (Concrete)

Roadways (Gravel)

Roadways Gravel

2 miles

Roadways (Total)

Roadways Total

1,212 miles

Roundabouts Traffic Circles

Roundabouts & Traffic Circles

26

RRFB Crosswalks

RRFB Crosswalks

42

Seawalls

Seawalls

8 Seawalls 5.7 miles (30,000 LF)

School Zones

School Zones

65

Sidewalks

Sidewalks

825 miles

Speed Tables

Speed Tables

441 Speed Tables
16 Humps/16 Cushions

Streetcar

Streetcar

2.7 Miles

Street Lights

Street Lights

41,000

Traffic Cams

Traffic Cameras

75

Traffic Signs

Traffic Signs

>88,000

Traffic Signals

Traffic Signals

554 Intersections

Stormwater

Box Culverts

Box Culverts

34 Miles

Ditches

Ditches

188 Miles

Inlets/Manholes

Inlets/Manholes

26,857

Outfalls
(Major)

Outfalls (Major)

905

Pipes
Gravity

Pipes(Gravity)

525 Miles

Pipes
(Force Main)

Force Main Pipes

2.6 Miles

Ponds
-

Outfalls (Major)

137

Pump
Stations

Pump Stations

13

Stormceptors
Baffle Boxes

Stormceptors Baffle Boxes

43

Updated: 10/01/2023