Temporary Lane Closure of Davis Boulevard/Davis Islands bridge October 13, 2018 for Bridge Maintenance

10/11/18
This notice is archived content and this information may no longer be accurate.

A portion of the Davis Boulevard/Davis Islands bridge between Arbor Place and W Verne Street will close on Saturday, October 13, 2018 for bridge maintenance.  One (1) northbound lane on Davis Boulevard/Davis Islands bridge between Columbia Drive and W Verne Street will close at 8 am on October 13, 2018.  A City contractor will perform pot hole repairs in the northbound left lane of Davis Islands bridge. 

One (1) northbound lane on Davis Boulevard/Davis Islands bridge between Columbia Drive and W Verne Street will be maintained during construction, with delays.

The Tampa General Hospital northbound exit lane and the northbound exit ramp to Bayshore Boulevard will remain open during construction.

It is anticipated that all lanes on Davis Boulevard/Davis Islands bridge will reopen to traffic by 4 pm on Saturday, October 13, 2018, weather permitting.  

A hi-resolution map with the City of Tampa’s suggested alternate routes can be found embedded below:

Traffic Advisory: Temporary Lane Closure Davis Boulevard/Davis Islands bridge October 13, 2018 for Bridge Maintenance, to be released today, October 11, 2018

CWS-19-0000012

 See all road closures at www.tampagov.net/RoadClosures

TRAFFIC ADVISORY

For additional information, please contact:

Don Cermeno, Construction Engineer

City of Tampa Contract Administration / Construction Management

(813) 635-3400; don.cermeno@tampagov.net