Temporary Road Closure – West Watrous Ave. at the intersection of Henderson Blvd. and S Church Ave. From July 6, 2020 at 9:00 AM through August 26, 2020 at 4:00 PM for a Capital Improvement Project.

Posted
09/10/20
This notice is archived content and this information may no longer be accurate.

West Watrous Ave at the intersection of Henderson Blvd and S Church Ave will be closed from July 6, 2020 at 9:00 AM through August 26, 2020 at 4:00 PM as part of the Upper Peninsula Stormwater Capital Improvement Project.  A city contractor will be installing 8’x5’ stormwater box culvert, stormwater inlets, 8” wastewater, 16” water main and new roadway.  Pedestrian access will be maintained at the intersection during construction if possible.

road closure map

See all road closures at www.tampagov.net/RoadClosures

For additional information, please contact:

John Zemina, Kimmins Contracting  Corp.

813-924-5010, jzemina@kimmins.com

 

Albert “P.J.” Calloway

Chief Construction Engineer, Contract Administration Department – Construction Management

(813) 630-3902; (813) 433-6183 (c)

albert.calloway@tampagov.net