Traffic Advisory - Temporary Road Closure on Tyler Street from Ashley Drive to MacInnes Place to begin May 5, 2016 for UCAP Construction

05/05/16

As part of the City of Tampa’s Downtown Utility Capital Improvement Projects (UCAP), the westbound lane on W. Tyler Street between Ashley Drive and MacInnes Place will be closed on May 5, 2016.  Eastbound traffic on W. Tyler Street will remain open.

This closure is for an emergency installation of a sample point along the 36-inch water main.  The lane closure shall be closed until approximately May 6, 2016.

Motorists traveling westbound on W. Tyler St. will be detoured to W. Cass St. and can either continue over the Cass Street Bridge or loop back around to W. Tyler St.  Southbound and Northbound traffic on Ashley Drive will also need to use to Cass Street to access the Cass St Bridge and the Straz Performing Arts Center.

The City of Tampa recommends that motorists use alternate routes to avoid traffic congestion.
    
Questions or comments should be directed to the UCAP hotline at (813) 777-9222.   

For additional information, please contact:
Tricia Shuler, ENV SP
CH2M HILL Public Involvement Manager
(813) 874-7717; tricia.shuler@ch2m.com

The above notice is archived content and may contain information that is no longer valid. This includes URL's that were valid when originally published, but may now link to sites or pages that no longer exist.