Traffic Advsiory - Temporary Road Closure on Tampa Palms Boulevard to begin May 20, 2016 for Road Construction

05/13/16

Tampa Palms Boulevard, south of Bruce B. Downs Boulevard will be closed on Friday, May 20, 2016 at 6 pm and will reopen on Monday, May 23, 2016 at 5 am as part of the Bruce B. Downs Blvd. roadway widening project.  The contractor will be installing a new 30” wastewater force main.

The thru lanes on Bruce B. Downs Boulevard will remain open.  Pedestrian access will also be maintained.

Tampa Palms Traffic Advisory

For additional information, please contact:

Lawrence Floyd (Dwayne)
Utility Superintendent
PRINCE Contracting LLC.
(813) 699-0511; lfloyd@princecontracting.com

The above notice is archived content and may contain information that is no longer valid. This includes URL's that were valid when originally published, but may now link to sites or pages that no longer exist.