East-West Green Spine Phases 2 &3

Green Spine Project Map
Green Spine Project Map

The project consists of an urban trail/cycle track along Cass Street, Nuccio Parkway and 15th Street to connect North Hyde Park from Howard and Armenia Avenues as well as Tampa Heights, Ragan Park, and VM Ybor to the Hillsborough River. The cycle track would begin at Howard Ave and Cass St. near the Armory. It will follow Cass St. into downtown to Nebraska Ave, then Nuccio Parkway into Ybor City, then 15th St. to Cuscaden Park at 21st Ave. The project was conceptualized as part of the InVision Tampa Center City Plan to provide a pedestrian and bicycle access between N. Hyde Park, Downtown and Ybor City. It will provide a safe and accessible bicycle connection to the Tampa Riverwalk and a safe connection between neighborhoods.


The downtown segment from east of the Cass St. Bridge to Nebraska Avenue, has been constructed as part of the Tyler Street and Cass Street Two-Way conversion project. (The final segment between the Cass St. Bridge and Ashley Dr. will be constructed by the developer of the AER in the Arts District project.)


Excepting the 0.8-mile segment being constructed as part of the Cass St./Tyler St. Two-Way Conversion project, the net length of the project 2.6 miles. The total length of the project will be approximately 3.4 miles.

More information regarding the project can be found below.

Brochure:

PDF iconeast_west_green_spine_brochure_updated.pdf

Presentation:

PDF iconpresentation_final_2016-03-09.pdf